How We Supply Capabilities, not claims

How WARMHAUS Supplies Four Kinds of Buyer

This page answers the question that actually decides a first order: can you supply my kind of project, with what documents, and how fast? Below are the four supply scenarios we are set up for — distributor programmes, construction projects, underfloor-heating systems and OEM / private label — each with the product range we can ship, the paperwork that travels with the goods, and our order policy. Manufacturing since 1993, certified to ISO 9001, ISO 14001, ISO 45001, EU CE and SGS. No minimum order quantity. Standard lead time 45 days from order confirmation.

i. Manufacturer · Since 1993 ii. ISO 9001 · 14001 · 45001 · SGS · CE iii. No MOQ · 45-day lead time

Four Supply Scenarios Four buyers

Four Ways WARMHAUS Supplies a Buyer

Each of the four buyers below asks a different question before placing a first order. Go straight to the scenario that matches your business and read what we can actually commit to.

A distributor needs to know how small a first order can be and how wide the range goes. A project buyer needs to know which documents will clear a tender. An installer needs to know that pipe, manifold, actuator and thermostat come from one supplier and fit each other. An OEM buyer needs to know whether their own brand can go on the product without losing the certification file behind it. The table sets out the honest answer for each — including the one number we do not dress up: a standard lead time of 45 days.

ScenarioThe question it answersWhat we commit to
I. Distributor Programmes“How small can my first order be, and how wide is the range?”No minimum order quantity; trial order then mixed containers across PPR, HDPE, PE-RT/PEX and brass
II. Construction Projects“Which documents will clear my tender and my customs file?”Submittal pack: ISO 9001 / 14001 / 45001, EU CE, SGS, and pipe produced to DIN 8077 / DIN 8078 — copies on request
III. Underfloor Heating Systems“Can one supplier cover pipe, manifold, valves and controls?”PE-RT and PEX pipe, brass manifolds, flow/return valves, actuators and thermostats from one order
IV. OEM / Private Label“Can my brand go on it without losing the certification file?”Own production lines since 1993; custom marking and packaging, produced under the same ISO and CE scope

The Four Scenarios Supply capability

What We Can Supply, Scenario by Scenario

One rule governs every line below: it describes what we can commit to on your order, not a transaction we are claiming already happened. Typical configuration, available range, documents that travel with the goods, order policy and lead time.

I. Distributor Programme — Partnership di distribuzione

Distributor Programme

For importers and regional distributors opening a new range. A first-year programme typically starts with a trial order — there is no minimum order quantity — and moves to mixed containers once the range settles. The catalogue that supports a full plumbing shelf: PPR in residential, premium, engineering, PP-R/AL composite and stabilised composite grades, HDPE, RPAP5, PE-RT and PEX underfloor pipe, brass ball valves, brass fittings, angle valves, compression fittings and PPR ball valves.

Configuration → Range → Terms — mixed-SKU containers across all systems. No MOQ; standard lead time 45 days from order confirmation. Raw materials from Hyosung, Borealis and LG; ISO 9001, ISO 14001, EU CE and SGS certificate copies available on request. See the Distributor Terms

How a distributor partnership works

II. Construction Project — Progetto di costruzione

Construction Project Supply

For developers, MEP contractors and project buyers who must clear a specification before they can place an order. For a residential or commercial building, the submittal pack we can put together covers ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates, EU CE and Swiss SGS approvals, and pipe produced to DIN 8077 / DIN 8078 and GB/T 18742.2-2017. Beyond building services, the same range covers municipal water and drainage, gas, fire protection, environmental and agricultural work.

Configuration → Documents → Terms — hot and cold PPR risers and branches, HDPE and RPAP5 where specified, brass valves and fittings at the outlets. Certificate copies available on request; certificate numbers issued with the submittal. Standard lead time 45 days from order confirmation. See Project Supply

How we supply a construction project

III. Underfloor Heating — Radiant systems

Underfloor Heating Systems

Where buying from one manufacturer pays off. A floor loop specified with us is quoted as a set: PE-RT or PEX pipe on the floor, a brass manifold with flow and return valves at the cabinet, electrothermal actuators on the manifold and thermostats on the wall. Because all four come off our own lines, sizes, threads and connections are matched at the quotation stage rather than on site.

Configuration → Range → Terms — PE-RT and PEX-B pipe, brass manifolds, inlet/outlet valves, thermostatic valves, actuators and controls, plus PEX press, slide and brass fittings. No MOQ; standard lead time 45 days from order confirmation. DIN 8077 / DIN 8078; certificates on request. See the Heating System

IV. OEM / Private Label — Private label

OEM & Private Label

For partners who want their own brand on the product. We have produced on our own lines since 1993 across three plants totalling 100,000 m² of building area, with more than 500 staff including 50+ in research and technical roles — so custom pipe marking, printed cartons and labelling are handled in-house rather than subcontracted. The product still comes off the same certified lines, which means the ISO and CE documentation continues to stand behind what you sell.

Configuration → Branding → Terms — your marking and packaging on PPR, HDPE, PE-RT/PEX or brass lines. No MOQ, so a first private-label run can be sized to your market; standard lead time 45 days from order confirmation, which is the figure to plan a launch date around. See OEM Terms

Our Standard of Proof Documented facts only

No Invented Numbers. Verified Proof Only.

Anyone can post a wall of client logos and a page of impressive figures. We don’t. You will not find a single customer name, project name or order volume on this page, because we publish only what we can back with a document.

Here is our standard, stated plainly. We publish figures that come from our own operations and certificates issued to us by third parties — nothing else. What that covers: a manufacturer producing since 1993 on its own production lines, three plants totalling 100,000 m² of building area, over 500 staff including more than 50 in research and technical roles, a total capacity of 2,000 tonnes per month of which 600 tonnes is pipe, fittings and brass ball valves, raw material from Hyosung, Borealis and LG, production to DIN 8077 / DIN 8078 and GB/T 18742.2-2017, and certification to ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, EU CE, Swiss SGS and Russian PT — copies available on request. It also covers the number a supplier is tempted to hide: our standard lead time is 45 days from order confirmation, and we would rather you plan around it than be surprised by it. Customer projects will be published here only after the customer concerned gives written consent — until then, this page describes capability, not history.

i. Manufacturing since 1993 from our own production lines — a real manufacturer, not a re-badged trading label
ii. ISO 9001 · ISO 14001 · ISO 45001 · EU CE · SGS · Russian PT — third-party certification, copies available on request
iii. Four systems, one supplier — PPR + PE-RT/PEX + brass + underfloor heating, quoted and matched as one order
iv. No customer named without written consent — no invented clients, volumes, growth rates or testimonials, ever

FAQ Common questions

How We Supply — Frequently Asked Questions

For the Importer / Exclusive Distributor
There is no minimum order quantity, so a first order can be sized as a trial rather than a commitment — enough to test the range in your market and check the goods against your own inspection. Once the range settles, most programmes move to mixed containers combining PPR, HDPE, PE-RT/PEX and brass on one order. Standard lead time is 45 days from order confirmation, so build that into your stock planning from the first purchase order.MOQ: none. Standard lead time: 45 days.
For the Project Buyer
For a building project, the submittal pack we can assemble covers ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates, EU CE and Swiss SGS approvals, and confirmation that pipe is produced to DIN 8077 / DIN 8078 and GB/T 18742.2-2017. Certificate numbers are issued with the submittal rather than published on the website; copies are available on request. Send us the specification clause you have to satisfy and we will tell you plainly whether our documents meet it.Certificate copies: available on request.
For the OEM / Private-Label Buyer
Yes. Four systems can carry your brand, with custom pipe marking and packaging, produced on our own lines so the ISO 9001, ISO 14001 and EU CE documentation still stands behind the product you sell. There is no minimum order quantity, so a first private-label run can start at the volume that suits your market. Standard lead time is 45 days from order confirmation — add your artwork approval time on top of that when you set a launch date.MOQ: none. Standard lead time: 45 days.
For Every Buyer
Because we will not name a customer, a market or an order volume without that customer’s written consent, and we will not invent one to fill the space. What is confirmed and documented today: a manufacturer producing since 1993 on its own production lines, over 500 staff across three plants totalling 100,000 m², total capacity of 2,000 tonnes per month, and ISO 9001:2015, ISO 14001:2015, ISO 45001:2018, EU CE, SGS and Russian PT certification — copies available on request. Anything we do publish here, you can forward to your own customers without checking it first.Customer projects: published only with written consent.

Start Here Let’s talk

Start Your WARMHAUS Project

Whether you are opening a distribution range, specifying a construction project, quoting an underfloor-heating job or launching a private label — tell us your market, your systems and your scope. Our export team comes back with the product list, the certificate copies and a delivery date built on the standard 45-day lead time. Response time: within one working day.

We partner with distributors, projects and OEM/private-label brands — regional and B2B partnerships only. We do not sell single items to end consumers.